Planning Review on Development of Ex-Cha Kwo Ling Kaolin Mine Site

The Planning Review on Development of Ex-Cha Kwo Ling Kaolin Mine Site (the Study) was commissioned by the Planning Department in July 2011 and was completed in mid-2014.

An extract of its recommended Master Layout Plan (MLP) and its Explanatory Statement under the Study is attached. A set of the final report of the study is available at the Planning Department’s Planning Enquiry Counters (PECs) for public inspection.

The findings of the Study form the basis for the subsequent Engineering Feasibility Study for Development of ex-Cha Kwo Ling Kaolin Mine Site – Feasibility Study and the Development of ex-Cha Kwo Ling Kaolin Mine Site – Design and Construction, for site formation works and infrastructural provision undertaken by the Civil Engineering and Development Department. Taking into account the findings of the two subsequent studies, refinements to the MLP are incorporated. The recommended land use proposals have been incorporated into the draft Cha Kwo Ling, Yau Tong, Lei Yue Mun Outline Zoning Plan No. S/K15/22 which was exhibited on 19.12.2014 for public inspection.

 

Recommended Master Layout Plan and its Explanatory Statement

Addresses of the PECs:

North Point
17th Floor, North Point Government Offices,
333 Java Road, North Point, Hong Kong

Sha Tin
14th Floor, Sha Tin Government Offices,
1 Sheung Wo Che Road, Sha Tin, New Territories