image

Planning and Engineering Study on Development of Lok Ma Chau Loop
image
 
 
Summary of Technical Report
image
Title

Posting Date

December 2009

Executive Summary of TR1 – Baseline Update and Review of Key Issues June 2010
Executive Summary of TR2A – Guiding Principles March 2010
Executive Summary of TR2B – Formulation of Conceptual Land Use Options, Preliminary Outline Development Plan, Preliminary Master Urban Design and Landscape Plan November 2010
Executive Summary of TR3 – Broad Technical, Environmental and Air Ventilation Assessments November 2010
Executive Summary of TR4 – Preferred Land Use Option and Recommended Outline Development Plan May 2012
Executive Summary of TR5 – Stage 1 Engineering Assessment May 2012
Executive Summary of TR7 - Stage 1 Implementation Strategy, Cost and Revenue Estimate and Development Programme May 2012
Executive Summary of Technical Report No. 8 – Engineering Assessments (Stage 2) February 2015
TR9A - Finalisation of Layout Plan and Recommended Master Urban Design and Landscape Plans and
TR 9B - Stage 2 Implementation Strategy, Cost and Revenue Estimate and Development Programme
February 2015
Executive Summary of Final Report February 2015
 
 
http://www.adobe.com Viewing of documents (PDF format) above requires Adobe Acrobat reader which can be downloaded at http://www.adobe.com
Planning DepartmentCivil Engineering and Development DepartmentLevel Double-A conformance, W3C WAI Web Content Accessibility Guidelines 2.0Web for All 

Last Revision Date: 20-5-2015
2009© | Important Notices | Privacy Policy

 
 
image   image
繁體 简体