Page 18 - nt_tsw_en
P. 18

The NDA will be a green city adopting a sustainable and energy saving strategy in respect of town
            planning, urban design, transportation and green infrastructure to achieve efficiency, carbon emission
            reduction and sustainable living.  Major population, economic activities and community facilities will
            be concentrated within walking distance of mass transit and public transport nodes.  Green mobility
            is promoted within the NDA through the introduction of the Green Transport Corridor (GTC) and a
            comprehensive cycling and pedestrian network.  To promote sustainable use of water, reusing treated
            sewage effluent and harvested rainwater for non-potable purposes such as toilet flushing and irrigation
            within the NDA will be explored.  Sustainable Drainage System and blue-green infrastructure will also be
            pursued.





            Development in Hung Shui Kiu/Ha Tsuen

            New Development Area



            In planning the development of the HSK/HT NDA, suitable sites have been reserved for various types of
            land uses including residential, commercial, industrial, open space and the provision of different types of
            community and infrastructural facilities to meet the needs of the population.

            Housing


            Residential sites with higher development intensity are planned around the planned HSK Station and the
            existing Tuen Ma Line TSW Station to reinforce their respective functions as town centre and District
            Commercial Node.  The proposed public/private housing ratio in HSK/HT NDA will help achieve a proper
            balance in the regional context.  Existing
            village clusters within the NDA (Figure 31)
            will be retained where possible and the
            historical relics and monuments will be
            preserved.  Upon completion of the planned
            development, the overall flat mix ratio of the
            HSK/HT NDA will be about 55:45 between
            public (including public rental housing and
            subsidised sale flat) and private permanent
            housing (including village housing).  The
            planned population in the HSK/HT NDA will
            be about 231 800.



                                                                Figure 31: Existing village clusters within the NDA
















    17
   13   14   15   16   17   18   19   20   21   22   23