Page 94 - ar2019_en
P. 94

Appendix 2



            Consultancy Studies undertaken by the Planning Department in 2018


                                                                                      2012             2013


           Planning and Engineering Study on Future Land use at Ex-Lamma Quarry
                             Area at Sok Kwu Wan, Lamma Island – Feasibility Study

                          Planning and Engineering Study for Housing Sites in Yuen Long South –
                                                                                       Investigation

                  Planning and Design Study for the Redevelopment of Queensway Plaza, Admiralty - Feasibility Study



                                  Urban Design Study for the Wan Chai North and North Point Harbourfront Areas - Feasibility Study

                                                            Strategic Environmental Assessment for Hong Kong 2030+: Towards a Planning

                                                                                                     Vision and Strategy Transcending 2030
                                                Planning and Design Study on the Redevelopment of Government Sites at Sai Yee Street and
                                                                                                  Mong Kok East Station – Feasibility Study


                                                                         Transport and Land Use Assessment for Hong Kong – Feasibility Study


                                            Pilot Study on Underground Space Development in Selected Strategic Urban Areas – Feasibility Study



                                                                     Preliminary Land Use Study for Lam Tei Quarry and the Adjoining Areas – Feasibility Study



                                                                       Planning and Engineering Study for Re-planning of Tseung Kwan O Area 137 – Feasibility Study


                                                                          Study on Existing Profile and Operations of Brownfield Sites in the New Territories - Feasibility Study







                                                                         Sustainability Assessment for Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030



                                                                                                                                     Survey on Business Establishments in Kowloon East 2018

            Remarks:

            •  Planning and Engineering Study for Tuen Mun Areas 40 & 46 and the Adjoining Areas - Feasibility Study
                was suspended as the River Trade Terminal (RTT) Site was included as one of the land supply options as
                recommended by the Task Force on Land Supply in 2018.  A review on the proposed land uses in Tuen
                Mun West may be necessary.

            •  Planning, Engineering and Architectural Study for Topside Development at Hong Kong Boundary Crossing
                Facilities (HKBCF) Island of Hong Kong-Zhuhai-Macao Bridge – Feasibility Study - Pursuant to the 2018
                Policy Address, the Airport Authority Hong Kong has been invited to submit a proposal for the topside
                development at the Hong Kong Boundary Crossing Facilities Island.

     91     Appendices
   89   90   91   92   93   94   95   96   97   98   99