Page 107 - ar2018_en
P. 107
Appendix 2 Appendices
Consultancy Studies undertaken by the Planning Department in 2017
2014 2015 2016 2017 2018 2019 2020
Planning and Design Study for the Redevelopment of Queensway Plaza, Admiralty - Feasibility Study
Preliminary Feasibility Study on Developing the New Territories North
Planning and Engineering Study on Tuen Mun Areas 40 and 46 and the Adjoining Areas – Feasibility Study
Urban Design Study for the Wan Chai North and North Point Harbourfront Areas
104
Planning, Engineering and Architectural Study for Topside Development at Hong Kong Boundary Crossing Facilities
Island of Hong Kong-Zhuhai-Macao Bridge – Feasibility Study
Consolidated Economic Development Strategy for Lantau and Preliminary Market Positioning Study for
Commercial Land Uses in Major Developments of Lantau
Strategic Environmental Assessment for 'Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030'
Planning and Design Study on the Redevelopment of Government Sites at Sai Yee Street and
Mong Kok East Station – Feasibility Study
Transport and Land Use Assessment for Hong Kong – Feasibility Study
Pilot Study on Underground Space Development in Selected Strategic Urban Areas – Feasibility Study
Preliminary Land Use Study for Lam Tei Quarry and the Adjoining Areas – Feasibility Study
Planning and Engineering Study for Re-planning of Tseung Kwan O Area 137 – Feasibility Study
Study on Existing Profile and Operations of Brownfield Sites in the New Territories
Cross-boundary Travel Survey 2017
Sustainability Assessment for 'Hong Kong 2030+: Towards a Planning Vision and Strategy Transcending 2030'