Page 61 - ar2018_en
P. 61

Approved OZP                                                            Focus
            Development                       No. S/K22/4                    Review            Change (%)

             Parameters                   (include approved                   Study
                                       planning applications)

                                                                                                 +680 000
                             2
        Residential GFA (m )                    2 220 000                   2 900 000
                                                                                                  (+31%)

                                                                                                  +10 900
        No. of Flats                              39 000                      49 900
                                                                                                  (+28%)

                                                                                                  +29 000
        Population                               105 000                     134 000
                                                                                                  (+28%)

                                                                                                 +330 000
                              2
        Commercial GFA (m )                     1 950 000                   2 280 000
                                                                                                  (+17%)

                                                                                                  +20 000
        Employment                                79 000                      99 000
                                                                                                  (+25%)

                         Table 1 - Changes in Development Parameters and Population/Employment

                                                                                                                   58
            Synergy with CBD2


            Upon completion of the Review Study in 2016, a total commercial GFA of about 2.28 million
            sq metres is recommended to be provided in KTD, centred in two major clusters, namely
            Areas 1 and 2 (North Apron) with 1.38 million sq metres and Area 3 (South Apron) with 0.43
            million sq metres.  Coupled with the envisaged new supply in the Business Area of Kowloon
                                                   1
            Bay, Kwun Tong and San Po Kong , there would be a potential total supply of 7 million
            sq metres of commercial GFA in KE to support the development of CBD2.

            Apart from the provision of additional commercial GFA in KTD, a comprehensive network
            of elevated walkways, subways and underground shopping street will be implemented to link

            up the KTD with other districts of KE.  With the enhanced pedestrian connections, the major
            commercial clusters of North Apron and South Apron can be closely connected to San Po
            Kong and Kowloon Bay respectively and create greater synergy effect.  Through the existing
            and planned transport infrastructure (including SCL and Route 6 comprising Central Kowloon









                1 As promulgated in the 2017 Policy Agenda, the Energizing KE initiative is extended to San Po Kong, with
              particular focus on enhancing connectivity, improving the environment, and promoting vibrancy and
              diversified development.
   56   57   58   59   60   61   62   63   64   65   66